Goolwa Pump Track Maintenance
The maintenance work at the Goolwa pump track was completed in December 2024. A local contractor addressed erosion and edge damage by reshaping the edges with fresh dirt and sealing cracks in the bitumen, ensuring the track remains safe and enjoyable for all users.