The Port Elliot Oval requires upgrades to its irrigation system and stormwater infrastructure to ensure its long term viability as a preferred sporting venture for local sporting clubs. Council’s contractor, Think Water Adelaide, will commence work for the renewal of the irrigation system at the Port Elliot Oval on Monday, 12 October 2020, with an expected completion date of Friday, 13 November 2020. Works will take place Mon – Sat between 7.00am – 5.00pm, and Sunday 9.00am – 5.00pm.